I worked as a Marine Engineer in the Marine Team at the Jamuna Rail Bridge, where I was involved in a range of challenging tasks related to marine equipment in the river. The project was supported by JICA (Japan International Cooperation Agency), and I collaborated with IHI (Ishikawajima-Harima Heavy Industries) throughout the project. My role involved handling complex engineering tasks, ensuring the successful execution of marine operations, and managing various technical aspects in a demanding environment.



I had the privilege of working in the Marine Department of the Jamuna Railway Bridge Construction Project, a landmark infrastructure initiative in Bangladesh. This project, officially known as the Bangabandhu Sheikh Mujib Railway Bridge, is a symbol of national progress and a vital step towards enhancing the country’s rail connectivity.

Throughout my tenure, I contributed to various marine operations critical to the project's success. It was both a challenging and fulfilling experience, requiring precision, teamwork, and dedication to ensure the smooth execution of our tasks.

Being part of this historic project was a matter of immense pride for me. Completing my role successfully, alongside a committed team, gave me a profound sense of accomplishment. I take great pride in knowing that my efforts have contributed to a transformative project that will positively impact millions by improving transportation, fostering economic growth, and connecting regions.

This experience not only strengthened my professional skills but also instilled a deep sense of commitment to contributing to the development of my country.




Project summary

Name

Package-WD 2 for the Bangabandhu Sheikh Mujib Railway Bridge Construction Project Western Part of Civil Works

Client Government of the People’s Republic of Bangladesh, Ministry of Railways, Bangladesh Railway
ContractorsIHI-SMCC Joint Venture
Construction period48 months
Construction periodSirajganj and Tangail districts
Contract works

6,075.7m (total length of the whole project:11,300 m)

2,250m steel truss bridge (total length of the bridge: 4,800m) (steel pipe sheet pile foundations), viaduct, track, embankment, station building construction, and river training works

Location map

IHI Infrastructure Systems Co., Ltd. has constructed numerous bridges in overseas. Sumitomo Mitsui Construction Co., Ltd. has amassed great technical and competitive prowess in steel pipe sheet pile foundations, a challenging aspect of the work in this project. These combined strengths led to the new award. Both companies will leverage their expertise to contribute to the economic development of Bangladesh through the project.

0 Comments

Get in Touch with Me

Looking forward to hearing from you. Let’s make something great together!